Bridge strikes
The one mistake that can end a driving career in an afternoon. It is entirely preventable, and the step that matters most is the one drivers are least often told plainly.
If you have just hit a bridge, ring the railway now
03457 11 41 41 Network Rail, 24 hours
Or the number on the identification plate on the bridge itself. Before the police, and long before the depot. A strike can move a bridge and the track on it, and there may be a train on its way. Read the rest of this page afterwards.
Before you turn a wheel
Know the height, today's height
Not the height on the headboard. Coupler heights vary, the fifth wheel gets adjusted, and a trailer loaded is not a trailer empty. If the measured height and the headboard disagree, that is a discrepancy to report, not a rounding error to ignore.
Have it displayed in the cab, in both
IF YOUR TRAVELLING HEIGHT IS OVER 3 METRES AND THE CORRECT MAXIMUM HEIGHT IS NOT DISPLAYED IN THE CAB, YOU ARE COMMITTING AN OFFENCE. Feet and inches as well as metres, because British bridge signs are in feet and inches and the number in your head has to match the number on the sign without arithmetic.
Know the route before you are on it
A car sat nav does not know your height. An HGV sat nav only knows it if somebody typed it in, and it is still not a substitute for looking. Advance warning signs are NOT provided at every low bridge.
Check the ride height, especially on a double deck
Air suspension changes the height. A trailer left raised after a loading dock, or a faulty valve or bag on one side, can sit higher than the headboard says, and often on one corner only. Before you leave, put the ride height back to normal and look along the trailer from behind: both sides level, nothing sitting high. On a double deck there are only centimetres to spare. If it will not sit right, report it and do not take it under a low bridge.
Check the load, not just the vehicle
The height that hits the bridge is the height of the tallest thing you are carrying, including equipment, sheeting and anything that shifted.
Reading the signs
Red circle
PROHIBITS. If your vehicle is higher than the figure, you must stop and must not pass it. Passing it means you are likely to hit the bridge and likely to be prosecuted.
Red triangle
WARNS. You should not pass it if you are higher than the figure shown.
No sign at all
Signs are only provided where the limit is under 16 feet 3 inches, which is 4.95 metres. No sign does not mean no limit, it means the limit is above that.
Arch bridge, white lines and goal posts
The signed height on an arch applies across a set width in the middle, normally three metres. Outside the lines the bridge is LOWER than the number, and that is the part that catches people who thought they had a few inches spare.
Feet and inches to metres
The signs are imperial. Your cab sticker may be metric. Nobody should be doing this sum at the last second.
| On the sign | In metres |
|---|---|
| 16 ft 3 in | 4.95 m |
| 16 ft 0 in | 4.88 m |
| 15 ft 9 in | 4.80 m |
| 15 ft 6 in | 4.72 m |
| 15 ft 3 in | 4.65 m |
| 15 ft 0 in | 4.57 m |
| 14 ft 9 in | 4.50 m |
| 14 ft 6 in | 4.42 m |
| 14 ft 3 in | 4.35 m |
| 14 ft 0 in | 4.27 m |
Print this and put it where you can see it.
If it happens, in this order
The order is the point. It is not a checklist to work through at your own pace.
1 Ring the railway. First. From where you are.
The number is on the identification plate on the bridge itself, usually on a pillar or the side wall, with the bridge's own reference. If you cannot find one, Network Rail's helpline runs 24 hours on 03457 11 41 41. DO NOT WAIT UNTIL YOU GET BACK TO THE DEPOT. A strike can move a bridge and the track on it, and there may be a train on its way. This single step is the difference between an expensive day and a disaster.
2 Then ring 999
Every bridge strike damages somebody else's property, and a road traffic collision causing damage to a third party must be reported. This is not optional and it is not a judgement call.
3 Then tell your employer, and your agency
The company whose vehicle it is, and the agency too if an agency sent you. In that order: the railway and the police come before the phone call you are dreading.
4 Keep people away and DO NOT MOVE THE VEHICLE
A struck bridge can come down. Moving the vehicle can bring it down. Wait.
5 If it is not a railway bridge
999 first, then your employer, then the same two rules: keep people back and leave the vehicle where it is.
What it costs, and who it costs
- A train could be derailed. That is the reason for the order of the steps above, and it is not a dramatic way of putting it.
- You can be prosecuted, and the offences carry prison or the loss of your licence.
- You can lose your job, and your own car insurance can go up afterwards.
- Your employer can lose their operator's licence, which ends the jobs of people who were nowhere near it.
- Your employer pays for examining the bridge, repairing it, recovering your vehicle and its load, and the delays to every train held up.
How often it happens
From 1 April 2024 to 31 March 2025, Network Rail recorded 1,666 bridge strikes in Britain: about one every five hours, more than the year before, at a cost of about £12 million in delays and cancellations alone. The same bridges are hit again and again:
| # | Bridge | Where | Times hit |
|---|---|---|---|
| 1 | Watling Street A5 | Hinckley | 22 |
| 2 | Harlaxton Road | Grantham | 18 |
| 3 | Stuntney Road | Ely | 15 |
| 4 | Stonea Road | Stonea | 15 |
| 5 | Lower Downs Road | Wimbledon | 15 |
| 6 | Station, B4105 | Berkswell | 14 |
| 7 | Ickleton Road | Great Chesterford | 11 |
| 8 | Barrowby Road | Grantham | 11 |
| 9 | Abbey Farm | Thetford | 11 |
| 10 | Coddenham Road | Needham Market | 11 |
Source: Network Rail, 8 December 2025. Their Wise Up, Size Up campaign has more for drivers and operators.
Low bridge map of the UK
A driver, Chris Minihan, put the UK's low bridges and their heights on a free Google map: zoom in on your route and click a marker for the height. It is not official and it is not complete, drivers know of bridges missing from it, so use it to plan and trust the sign on the road over any map. For turn by turn routing by your height there are paid apps, for example Low Clearance Map, and an HGV sat nav with your height typed in.
Every height, feet and inches to metres
Find the feet across the top and the inches down the side. For example 13 ft 7 in is 4.14 metres. Print it, cut it out, put it by the height notice in the cab.
| inches | 9 ft | 10 ft | 11 ft | 12 ft | 13 ft | 14 ft | 15 ft | 16 ft | 17 ft |
|---|---|---|---|---|---|---|---|---|---|
| 0 in | 2.74 | 3.05 | 3.35 | 3.66 | 3.96 | 4.27 | 4.57 | 4.88 | 5.18 |
| 1 in | 2.77 | 3.07 | 3.38 | 3.68 | 3.99 | 4.29 | 4.60 | 4.90 | 5.21 |
| 2 in | 2.79 | 3.10 | 3.40 | 3.71 | 4.01 | 4.32 | 4.62 | 4.93 | 5.23 |
| 3 in | 2.82 | 3.12 | 3.43 | 3.73 | 4.04 | 4.34 | 4.65 | 4.95 | 5.26 |
| 4 in | 2.84 | 3.15 | 3.45 | 3.76 | 4.06 | 4.37 | 4.67 | 4.98 | 5.28 |
| 5 in | 2.87 | 3.17 | 3.48 | 3.78 | 4.09 | 4.39 | 4.70 | 5.00 | 5.31 |
| 6 in | 2.90 | 3.20 | 3.51 | 3.81 | 4.11 | 4.42 | 4.72 | 5.03 | 5.33 |
| 7 in | 2.92 | 3.23 | 3.53 | 3.84 | 4.14 | 4.44 | 4.75 | 5.05 | 5.36 |
| 8 in | 2.95 | 3.25 | 3.56 | 3.86 | 4.17 | 4.47 | 4.78 | 5.08 | 5.38 |
| 9 in | 2.97 | 3.28 | 3.58 | 3.89 | 4.19 | 4.50 | 4.80 | 5.11 | 5.41 |
| 10 in | 3.00 | 3.30 | 3.61 | 3.91 | 4.22 | 4.52 | 4.83 | 5.13 | 5.44 |
| 11 in | 3.02 | 3.33 | 3.63 | 3.94 | 4.24 | 4.55 | 4.85 | 5.16 | 5.46 |
Worked out here, to the nearest centimetre (one inch is 2.54 cm). Highlighted: 16 ft 3 in, the height below which a bridge must carry a sign.
Take it with you, free. The same chart on one card, with our name on it, ready to print: tiny enough to fold into a phone case, bigger for the cab or the depot wall. Print at actual size (100 per cent, not "fit to page").
A8, folds into a phone case A7, wallet A6, pocket A5, cab A4, depot wall A3, transport office poster
The margin on the sign, and the one you do not have
- A sign shows at least 3 inches (75 mm) less than the bridge actually measures, rounded down to the next 3 inches. That margin is there for bounce, road resurfacing and snow, not for you to use.
- No sign means at least 16 ft 6 in (5.03 m) of clearance over the road, the standard minimum. Signs start below that, so the highest figure you will normally see is 16 ft 0 in.
- Arch bridges are signed for the middle of the road between the white lines; at the sides they are lower than the sign. Stay inside the lines and the marks on the bridge that show where the signed height applies: cut the corner and it is the top corners of the trailer that hit the arch.
- Over 3 metres high, any vehicle, Luton vans and box vans included: the travelling height must be displayed in the cab, in feet and inches (figures at least 40 mm tall), and may be shown in metres as well. A van that is over 3 metres without one is breaking the law.
How big the vehicle is, metric and imperial
Signs in Britain are in feet and inches, plates and cab stickers often in metres. The legal limits are fixed; the heights are typical, which is the point: yours is the one on your plate and in your cab, today, loaded.
| Metres | Feet and inches | What it is | |
|---|---|---|---|
| Width, any lorry or trailer | 2.55 m | 8 ft 4 in | legal limit |
| Width, fridge body | 2.60 m | 8 ft 6 in | legal limit |
| Length, rigid lorry | 12.00 m | 39 ft 4 in | legal limit |
| Length, articulated lorry | 16.50 m | 54 ft 2 in | legal limit |
| Length, articulated with a longer semi-trailer | 18.55 m | 60 ft 10 in | legal limit |
| Length, drawbar (wagon and drag) | 18.75 m | 61 ft 6 in | legal limit |
| Height you must display in the cab above | 3.00 m | 9 ft 10 in | legal rule |
| Height, typical curtainsider or box | 4.00 m | 13 ft 1 in | typical, check yours |
| Height, typical tall single deck trailer | 4.40 m | 14 ft 5 in | typical, check yours |
| Height, typical double deck trailer or bus | 4.90 m | 16 ft 1 in | typical, check yours |
| Bridges below this carry a height sign | 4.95 m | 16 ft 3 in | signing rule |
Weight, for the record: Articulated lorry, 6 axles 44 tonnes; Rigid lorry, 4 axles 32 tonnes. The plated weights on your vehicle are what apply to you. Before a route, check it: the daily walkaround check starts with the height marker.
Where this comes from
The facts here are checked against Network Rail's own good practice guide for professional drivers, NR/CE/GPG/004, which Network Rail publishes free to copy and pass on. The wording is ours. If you drive for us, this is also in the worker handbook, published before anybody signs anything.
Know a driver who should read this? Sending it costs nothing and it is how a small board grows.
These are ordinary links. No Facebook like widget, no follow widget and no tracking pixel, because those load somebody else's script and start watching you before you press anything. Nothing leaves this page unless you choose to send it.